    Introduction to installation specification of current transformer
    1 the installation of the current transformer must be firm. The exposed metal part of the transformer shell should be reliably connected.

    2 The same set of current transformers should be installed in the same direction to ensure that the primary and secondary circuit currents of the current transformers are in the same direction and the nameplate can be easily observed.

    3. The secondary side of the current transformer is not allowed to open circuit. When only one secondary circuit is used for the secondary double-turn transformer, the other secondary circuit should be reliably short-connected.

    4 the low voltage current transformer can not be grounded on the two side. Because the conductors, watt-hour meters and transformers used in low-voltage metering devices have the same insulation level, the highest voltage they can withstand is basically the same; in addition, after the secondary windings are grounded, the insulation level of the primary circuit of the whole set of devices to the ground is reduced, which makes the watt-hour meters or transformers with insulation weaknesses easy to be damaged under high voltage (such as induced lightning strikes). Bad. It is better to reduce the damage caused by lightning damage to two sides.
    Previous:Technical problems easy to appear in transformer test/ Next:How to use the current transformer correctly?
    Products
    Measuring current transformer
    Metering current transformer
    Protective current transformer
    Leakage (residual) protection device
    The zero sequence current transformer
    Voltage transformer
    Transmitter
    Meter
    common problem
    How to use the current transformer correctly?
    Introduction to installation specification of current transformer
    Technical problems easy to appear in transformer test
    Case
    Contact Us

    Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
    Zip code: 321017

    Tel: 0579-82235395 82235362
    Fax: 0579-82235388
    Website: www.gong-ping.com

    E-mail: jhaokai@126.com

    Copyright©Jinhua Aokai Electric Appliance Co., Ltd.    浙ICP备17016000号     Design by:www.579xd.com
    亚洲人成高清视频在线,国产国产成年在线视频区,男女性高爱潮视频高清,视频区 中文有码 中文无码